Section |
Areas & Beam Lines |
Machine Status |
The P0 Complex
The P0 complex is a beam that is derived either from the T4 or the T6 primary target. By means of a group of two horizontal dipole magnets (B8 and B9) the beam is directed either towards NA50 (P41 or P61 branch) or NA48 (P42 branch). The P62 branch from T6 to NA48 is for the moment not implemented. Please see the figure below for a schematic layout of this complex (not to scale).
A Postscript version is also available.
The P0 beam is used in the following modes: